Guide Vane Apparatus of Stanley Adamson Powerhouse SF0001 3900KW


TPIN: 5ARTYYBHO Condition: New
Price:
210000 $210,000.00

AVAILABILITY: OUT OF STOCK

Notify me when this product is in stock Notify me
Product Description

This guide vane apparatus turbine generator unit was manufactured by Sunfy Zhejiang in 2011.

This product is adopted by Stanley Adamson Powerhouse whose generation capacity is 3.9MW/h.

 

Company Introduction

Sinotec Sunfy was established in 2015.  It was made up of two companies: Zhejiang Sunfy and Sinotec.

 

Introduction of Zhejiang Sunfy

Zhejiang Sunfy was founded in 2006 and specialized in design, manufacture and supply of complete set of hydro generating equipments both in domestic and overseas energy equipment market.  It has more than 80 professional and technical personnel, including 4 professors.

The factory now has nearly 300 staff and labors.  The factory has 5 workshops, covering an area of 110,000m².  Equipped with more than 300 sets of large-size machines, such as Φ18m NC vertical lathe with boring-milling function, Φ3.5m NC horizontal lathe with bearing capacity of 125 tons, TK6920 NC floor type boring and milling machine, 4.2m×2.8m×1m NC gantry milling machine,NC machining center for runner blade & guide vanes , 6m×16m×200mm NC gantry plasma cutting machine and 70mm rolling machine, with a maximum lifting capacity of 2×100tons.

 

 

Main Capacity

Design and manufacturing capacity of hydraulic turbine and generator with auxiliary equipments

Bulb: 60MW, runner diameter 8m

Kaplan: 100MW, runner diameter 10m

Francis: 300MW, runner diameter 8m

Pelton: 50MW, runner diameter 3m

Bulb Turbine & Generator
Kaplan Turbine & Generator
Pelton Turbine & Generator
Francis Turbine & Generator

 

Layout of Factory (First Stage)

 

Key equipments & facilities:

Φ18m NC vertical lathe with boring-milling function 1set

Φ10m NC vertical lathe with boring-milling function 1 set

Φ6.3m NC vertical lathe with boring-milling function 1 set

Φ3.5m-125t NC horizontal lathe 1set

5-axes NC floor type boring & milling machine 1 set

NC gantry milling machine(L4.2mXW2.8mXH1m) 1 set

NC cutting machine (16mX6mX200mm) 1 set

NC plasma cutting machine 1 set

70mm rolling machine 1 set

 

Workshop Detail:

Machining Workshop for Large-size Parts
Welding Workshop
Electric Workshop
φ18m NC Vertical Lathe with Boring-milling Function. Major Parameters: Machining Dia. 18m, Machining Height 7.5m, Bearing Capacity 250t, Accuracy: Roundness 0.015mm, Flatness 0.04mm
Φ3.5m NC heavy horizontal lathe. Major Parameters: Machining Dia. 3.5m, Machining Length 12m, Bearing Capacity 125tons
TK6920 NC Boring and Milling Machine

 

 Quality Control

Quality Control Department     
Client Invites Third Party to Check Thrust Runner of Generator
Checking Profile of Guide Vane by Digital Measurement Device
Checking Distributor of Tubular Turbine by Quality Engineers of ANDRITZ
Ultrasonic Test
Devices of Electric Test

 

Introduction of Overseas EPC Projects

A. Patrind Hydropower Project

Location: Jhelum River, which Takes Water from Kunhar River, at the West Bank to the Township of Muzaffarabad in the A.K Kashmir, Pakistan

Dam: Concret Dam, 140m in Crest Length and 40.5m in Height

Installed: 50MWx 3 Units, Vertical Francis Turbine-generator Set

Turbine Runner Diameter: 2.4m

WaterHead: Min.: 104m, Rated: 109.5m, Max.: 113.7m

Contract Scope: Design, Manufacturing and Supply, Erection, Testing and Commissioning of Complete Hydraulic Structure, Whole Plant Mechanic and Electric

Equipments Commissioning: 2014

 

B.Wampu Hydropower Project

Location: At the Junction between Lau Biang River and Lau Mbelin River, District of

Tigabinanga, Indonesia

Installed: 15.6MWx 3 Units, Vertical Francis Turbine-generator Set

Turbine Runner Diameter: 1.37m

WaterHead: Rated: 153.13m

Contract Scope: Design, Manufacturing and Supply, Erection, Testing and Commissioning of Complete Hydraulic Structure, Whole Plant Mechanic and Electric

Equipments Commissioning: 2012

 

C. Dangjin Hydropower Project

Location: Dangjin-gun, South Korea

Dam: Concret Dam

Water: Cooling sea-water from Dangjin Thermal Power Plant

Installed: 1.66MWx 3 Units, Bulb Turbine-generator Set

Turbine Runner Diameter: 2.75m

WaterHead: Min.: 2m, Rated: 4.28m, Max.: 5.39m

Contract Scope: Design, Manufacturing and Supply of Turbine, Generator, Governor, Excitation System and Accessories

Commissioning: Dec. 28th, 2009

 

D. Dadang Hydropower Project

Location: Lam Ha District, Lam Dong Province, Vietnam

Installed: 7MWx 2 Units, Vertical Francis Turbine-generator Set

Turbine Runner Diameter: 1.05m

WaterHead: Max.:140, Rated: 131.5m, Min.:128m

Contract Scope: Design, Manufacturing and Supply, Erection, Testing and Commissioning of Whole Plant Mechanic and Electric Equipments

Commissioning: 2011

 

 

E. Dachomo Hydropower Project

Location: Lam Ha District, Lam Dong Province, Vietnam

Installed: 4.5MWx 2 Units, Horizontal Francis Turbine-generator Set

Turbine Runner Diameter: 0.9m

WaterHead: Max.:87m, Rated: 81m, Min.:74m

Contract Scope: Design, Manufacturing and Supply, Erection, Testing and Commissioning of Whole Plant Mechanic and Electric Equipments

Commissioning: 2011

 

 

 

 

 

 

Product Information
Technical Details
Additional Information